The offices and branches of Enter Engineering Group are located in Russia, Uzbekistan, Singapore, Czech Republic, United Arab Emirates, China and South Korea.

The Group’s presence in different countries allows to track all market trends as well as to be closer to its customers.

Офисы группы расположены в странах: Russia, Uzbekistan

Regional presence
  • World
  • Russia
  • Uzbekistan
RU AE UZ SG
  • Moscow, Russia
  • Dubai, UAE
  • Tashkent, Uzbekistan
  • Singapore, Singapore
RU RU RU
  • Moscow
  • “Yuzhno—Russkoye” Oil&Gas field

    “Yuzhno—Russkoye” Oil&Gas field

    • Construction of shift collection facility in Novy Urengoy.
    • Technical re-equipment of the “Yuzhno—Russkoye” Oil&Gas field facilities. Industrial base construction.
    • Production building with a warm parking area.
    • “Yuzhno—Russkoye” Oil&Gas field infrastructure development. Complex gas treatment plant.
    • Compressor department No 1 (stage 2).
    • Construction of administrative building in Noviy Urengoy.
  • Pipeline “Zapolyarye — Purpe” oil pumping station

    Pipeline “Zapolyarye — Purpe” oil pumping station

    • Oil heating point on 358.
    • Oil heating point on 285.
    • Oil heating point on 217.
UZ UZ UZ UZ UZ UZ UZ UZ
  • Tashkent
  • “Southern Kemachi” field

    “Southern Kemachi” field

    Construction of “Southern Kemachi” low-pressure gas utilization station of “Southern Kemachi”, “Western Kruk” and “Umid” fields.

  • “Nothern Nishan” field

    “Nothern Nishan” field

    • Construction of “Nothern Nishan” booster compressor station.
    • Development of 28 wells.
  • “Kandym” group of fields

    “Kandym” group of fields

    • Procurement of equipment, construction of central processing facility complex and development of “Kandym” group of fields.
    • Early gas of “Kandym” group of fields and development of the northern part of “Shady” area. I and II commissioning complex.
  • “Gissar” group of fields

    “Gissar” group of fields

    • Construction of facilities on “Adamtash”, “Gumbulak” and “Djarkuduk-Yangi Kizilcha” gas condensate fields.
    • Construction of filed support base at Djarkuduk-Yangi Kizilcha" field on “turn-key” basis.
    • Construction of external electrical power supply system. Construction of “Adamtash” field 110/10 kV substations and “Djarkuduk-Yangi Kizilcha” field 110/10 kV substations.
    • Construction of roads to “Adamtash”, “Gumbulak” and “Djarkuduk-Yangi Kizilcha” fields.
  • “Khauzak” field

    “Khauzak” field

    “Khauzak” booster compressor station.

  • “Shurtan” group of fields

    “Shurtan” group of fields

    • Site preparation for “GTL” plant.
    • Construction of a plant for production of liquid synthetic fuel on the basis of purified methane on the basis of “GTL” technology.
  • “Surgil” gas field

    “Surgil” gas field

    • Construction of “Usturt” complex gas treatment plant on the “Surgil” gas field with field infrastructure development.
    • Construction of raw gas pipeline, condensate pipeline, sales gas pipeline.