HISTORY

Company's history

-
2023-2024
  • Completion of construction works at Booster Compressor Station 6 (BCS 6) for Gazli UGS.
  • Completion of construction works at TZK-2 Oil Terminal in Tashkent.
  • Completed the project on establishment of the Branch of the Moscow Power Engineering Institute in Tashkent.
  • Completion of construction works and commissioning activities at the Enter Solar Green Energy Plant.
  • Completion of construction works and turnkey commissioning of the DCS at the South Tandyrcha field.
  • Completion of construction works at the "Event Hall" building on the territory of Uzbekfilm.
  • Construction commencement of Khodjiabad Oil Treatment Plant.
  • Construction commencement of shale processing complex in Navoi region.
  • Construction  commencement of new thermal power plants in Akhangaran district of Tashkent region (1320 MW), Altyaryk district of Fergana region (400 MW) and Kattakurgan district of Samarkand region (400 MW).
  • Construction commencement of fuel stations and CNG filling stations in Tashkent, Bukhara and Kashkadarya regions.
  • Start of works on the project "Construction of a new branch of the main gas pipeline 528-550 km Bukhara - Ural with a diameter of 1020 mm, 22 km long".
  • Commencement of engineering, procurement, construction and commissioning activities for the booster compressor station (BCS) at Surgil field.
2022-2023
  • Start-up of the Booster Compressor Station No.6 at Gazli UGS 
  • Completion of works on the Project - Construction of Aircraft Fuelling Facilities in Tashkent 
  • Commencement of works on the Project - Construction of Tebinbulak Mining and Metallurgical Complex
  • Completion of works on the construction of the 2nd Dengizkul Booster Compressor Station
  • Commencement of works on the construction of Campus of Samarkand International University of Technology 
  • Commencement of works on the construction of Enter Steel Karakul LLC Plant
  • Commencement of the construction of a 20 MW Onshore Grid-connected Solar Photovoltaic Power Plant in Samarkand
2021-2022

•    Delivery of the project "Construction of a tourist center in Samarkand".
•    Handover of Samarkand International Airport’s brand new terminal.
•    Commencing work for the “Construction of a chemical complex for the production of complex mineral fertilizers based on ammonia in the Syrdarya Region” Project.
•    Commencing work for the “Construction of the Aircraft Fueling Complex in Samarkand” Project.
•    Commencing work for the “Construction of a copper concentration plant No. 3 with a full technological production cycle under the Almalyk Mining and Metallurgical Complex (AMMC)” Project.
•    Commencing work for the “Construction of the Booster Compressor Station (BCS) at the Southern Tandyrcha Field” Project. 
•    Commencing work for the “UTG main gas pipeline revamping” Project. 
•    Initiating projects: constructing Unit A of BCS-7, and revamping Units A and B of BCS-4, CS-5. 
•    Commencing work on the “Mingbulak UKPG, Karakul GPP, West Aral UKPG” Projects. 
•    Commencing work on BCS projects at the Arniyoz and Maymanak Fields. 
•    Commencing work for the “Construction of Thermal Power Plant in the Karauzyak District of the Republic of Karakalpakstan” Project. 
•    Commencing work for the “Construction of hydraulic structures and service water supply system of the Tebinbulak complex” Project.
•    Commencing work for the “Construction of the gas chemical complex based on a Methanol-to-Olefin technology in Uzbekistan” Project.
•    Commencing work for the “Renovation of Imam Al-Bukhari memorial complex with landscaping of the adjacent area in Payaryk district, Samarkand region” Project.

2020 -2021
  • Completing work for the “Construction of ammonia and urea production complex under NAVOIAZOT” Project. 
  • Completing work for the “Construction of the UzGTL Synthetic Fuel Production Complex in Uzbekistan” Project
  • Completing the Uchkyr BCS 2nd start-up complex and starting supplying gas to the main pipeline. 
  • Starting up the BCS at the Zevarda Field. 
  • Putting the Alan BCS into operation.  
  • Starting the 4th train of the Sulfur Recovery Unit (SRU) at the Uchkyr Field. Rated gas output is 1.5 B m3/year.
  • Completing the “Renovation of the Holy Trinity St. George’s Monastery” Project. 
  • Completion of construction of Samantepe booster compressor station
  • Completion of construction of Uchkyr - Gazli gas pipeline
2019
  • Completing construction of the “HUMO ARENA multifunctional ice complex” Project.
  • Handing over the “Garbi mini-packaged compressor unit” facility.
  • Completing construction of the National Research Nuclear University “Moscow Engineering Physics Institute” (MEPhI) 
  • Putting the GCU-200 (Gas Compressor Unit) into operation and the first main gas pipeline launch at the “Further development of the Samantepe field with the BCS upgrade at the Southern Urtabulak field (along with Samantepe field)” facility.
  • Starting work on the "Construction of a tourist center in Samarkand" Project
  • Construction of IV and V production at North Berdak complex gas processing unit
  • Completion of Rotational camp on Chandyr deposit construction
  • Completion of construction of inspection highway along gas pipeline from Chandyr deposit to South Kemachi gas processing plant
2018

•    Kandym CPF Project: launching the gas pipeline from the Gathering System - ahead of schedule.
•    Putting the “Uchkyr SGU - Gazli Main Facilities ø 1020 mm x 46.3 km Gas Pipeline” facility into operation - ahead of schedule
•    Well 320 flaring and start-up operations at the Kandym CPF. 
•    Opening the “ERIELL prof education” Corporate Training Center.

•    Starting work on the "Design, delivery of equipment and construction of a gas processing plant, infrastructure facilities, gas collection, preparation and transportation system on a "turnkey basis" under the production sharing agreement in relation to the investment block "Uzbekiston Mustaqilligi" Project

•     Completion of works on Early gas of Kandym group of deposits and construction of northern part of Shady area, first construction stage, second launch complex 

2017
  • Completing the Kandym CPF project phase. Supplying gas to the Gas Processing Plant. 
  • Commencing work for the “Construction of the process facilities at the Uzbekneftegazdobycha facilities” Project.
  • Starting up brand-new facilities at the Gissar group of fields.  
  • Commencing work for the “Expansion of the Shurtan gas chemical complex production facilities” Project.
  • Completion of Arslan comprehensive gas preparation facility construction 
  • Completion of equipment, materials and construction of external water and fuel gas supply system for Adamtash, Gumbulak, Dzharkuduk - Yangi Kizilcha deposits and reconstruction of external water supply system of Dekhkanabad potash fertilizers plant
  • Completion of construction of access roads to Adamtash, Gumbulak and Dzharkuduk gas condensate deposits
  • Completion of construction of the facilities for the Adamtash, Gumbulak and Dzharkuduk - Yangi Kizilcha gas condensate deposits
  • Completion of 110 kV overhead line construction
  • Completion of South Kemachi booster compressor station construction
  • Completion of construction of North Nishan booster compressor station
  • Completion of sulfur production unit and sulfur pelletizing unit at Mubarek gas processing plant
  • Commencing the “Construction of the UzGTL Synthetic Fuel Production Complex in Uzbekistan” Project
2016

•    Commencing work for the “Renovation of the Mubarek Gas Processing Plant” Project.
•    Commencing work for the “Early gas of the Kandym group of fields and development of the Northern part of Shady area. 2nd start-up complex” Project.
•    Completing construction of the Northern Nishan BCS, and further development of 28 wells.
•    Completing construction of a BCS for the recovery of low-pressure gases at the Southern Kemachi, Western Kruk and Umid fields.

•    Completion of the construction and assembly works for Development of Shady and Khauzak sites of Dengizkul deposit project

•    Design, delivery, construction and commissioning of the support base at Dzharkuduk-Yangi-Kizilcha deposit

•    Completion of works on Early gas of Kandym group of deposits and construction of northern part of Shady area, first launch complex

2015
  • Commencing work under “Construction of the CPF at the Kandym field” Project.
  • Completing the construction of the BCS at the Khauzak Field.
  • Completing work under “Construction of the raw gas main pipeline”, “Construction of a condensate line from the Surgil UKPG to the UGCC”, “Construction of a gas pipeline from the UGCC to the Akchalok compressor station” Projects.
  • Starting up the first gas under the “Engineering, Procurement and Construction of Early Gas of ‘Kandym’ group of fields and development of the Northern part of ‘Shady’ area.  The 1st start-up complex” Project.
  • Completion of external water supply as part of the Grand Gissar project
2014

•    Commencing construction of the Northern Nishan BCS and development of 28 wells.
•    Commencing the construction of a Booster Compressor Station for the recovery of low-pressure gases at the Southern Kemachi, Western Kruk and Umid fields.
•    Commencing work under the “Construction of the main gas pipeline,” “Construction of a condensate line from the Surgil UKPG to the UGCC,” “Construction of a gas pipeline from the UGCC to the Akchalok compressor station” Projects.

•     Completion of Urga booster compressor station construction


2013
  •  Commencing construction of the Khauzak BCS.
  •  Commencing the “Engineering, Procurement and Construction of Early Gas of ‘Kandym’ group of fields and development of the Northern part of ‘Shady’ area.  The first start-up complex” Project.
  •  Completion of Zirabulak-Galjaaral gas pipeline construction
2012
  • Founding of ENTER Engineering Pte. LTD
  • Commencing the “Revamping of the second train of Zirabulak — Gallaorol main gas pipeline with the length of 43km” Project.