Activities of ENTER Engineering Pte. Ltd. during a global pandemic

17.04.2020
Поделиться:

Along with the world's leading enterprises, companies and organizations, ENTER Engineering Pte. Ltd. closely monitors the situation of the spread of coronavirus infection in all regions of its presence and sets an example in its counteraction.  

The company, realizing its responsibility ESG (criteria "Environmental, social and managerial"), has strengthened control over the personal hygiene of its employees at all its facilities: masks, medicines, hand sanitizers and room disinfection products have been purchased, temperature measuring points have been organized, hand disinfection stations have been installed. In addition, in order to provide timely assistance to its employees, the company has organized a round-the-clock presence of medical personnel.

 

In this context, I would like to focus on the activities of ENTER Engineering Pte. Ltd. during the global pandemic on the example of projects implemented in the territory of the Samarkand region.

In particular, during his visit to Samarkand, the head of state was instructed to reconstruct the local airport in accordance with modern requirements, develop the service sector and develop new projects to attract tourist flows. It is also planned, in addition to the construction of a new terminal, the reconstruction of the runway, the expansion of aircraft parking and the modernization of the airport's radar systems.

1.jpg

As part of the implementation of this task, ENTER Engineering Pte. Ltd. has been actively carrying out earthworks since March 12 this year. According to the schedule, the pit is being developed with a total volume of 143850 m33, to date, 102488 m3 has already been developed. At this stage, about 100 specialists and more than 40 units of special equipment are involved at the construction site.

22.jpg

The second major project is ENTER Engineering Pte. Ltd. The construction of a large tourism cluster "Samarkand City" on the territory of 360 hectares, which will be a holiday destination for foreign and local tourists, as well as the population of the region, is planned from November 2019.

6.png

The tourist center will consist of two territories: in the northern part, a conference hall will be built for MICE tourism, business events and concerts, 2 five-star and 2 four-star hotels (the territory of the business zone); the southern part is designed for domestic tourism and pastime of residents of the region. There will be six three-star hotels, a water park, sports facilities, restaurants and cafes, retail outlets selling national products. An arboretum will be created on this territory, where, as planned, it will be possible to relax with a family.

3000 people will be able to visit the park at the same time. At the same time, the roads on the territory of the tourist center will be designed mainly for electric vehicles, and for walking - bike paths and sidewalks.

To implement the ENTER Engineering Pte. Ltd. project, modern technologies in the form of drilling piles from IKSA are used in the pits of hotels. Currently, more than 1,000 people and 261 pieces of equipment are involved at the construction site.

7.jpg

9.jpg

10.jpg

111.jpg

12.jpg

As previously noted, on all projects of ENTER Engineering Pte. Ltd., an anti-crisis headquarters is functioning on an ongoing basis to ensure uninterrupted operation against the background of the coronavirus pandemic, employees are provided with all necessary protective equipment, body temperature is regularly measured, official transport is provided for movement to work. In addition, round-the-clock medical supervision has been established for the health of employees.

Press-service ENTER Engineering Pte. Ltd.

 

Также рекомендуем